05/26/17 4:30pm

COMMENT OF THE DAY: DESTROY MY SEMI TRAILER ON N. MAIN ST. ONCE, SHAME ON ME “I’d bet that the signage, 12′-9″, is probably literally correct, in that the distance from the road deck to the bottom of the bridge measures 12′-9″. However, that doesn’t mean that a truck that’s 12′-8″ high can pass through. More to the point: that doesn’t mean a truck that’s 12′-8″ high can exit the other end. Problem is that since there’s an up-slope on the exit of the underpass, the longer the truck, the higher the effective height as it climbs up the slope. [And] with respect to the alternate route, the northbound signage is terrible. It seems to indicate that the driver should turn left into a chain link fence. Where they actually should go looks like its one-way the other way. If this happens once, I understand blaming the driver. If it happens frequently, it’s probably the result of poor design and poor signage.” [Angostura, commenting on Latest Semi To Get Stuck in that N. Main Tunnel by Hardy Yards Gets Top Shredded Off, Too] Photo: TransitCtrActivity

02/26/14 4:30pm

59 FEEDER ROAD CONSTRUCTION WITHOUT END Road Construction, North Side Feeder Rd., U.S. 59 West of Kirby Dr., Upper Kirby, Houston“Why is there always construction on the feeders between Weslayan and Kirby especially when it seemed like nothing needed to be done?” writes a Swamplot reader, who is under the impression that the work started sometime last summer. “It looks like they are only redoing the road, not adding sewers, nor laying power lines, and doesn’t seem to making it wider. One side is done and then they come back and do the other side! . . . I hope you can find out why they are tearing up a perfectly good feeder road.” Alas, doing so would spoil the chance to indulge in the fantasy of having encountered along the Southwest Fwy. a truly eternal feeder-road replacement cycle. We’ll illustrate that here with the above photo from earlier today of a fresh concrete placement (with shopping cart) on the north side feeder just west of Kirby Dr. Update, 2/27: Clever reader JD finds an actual report outlining the scope of the reconstruction project from last year posted in an obscure online publication. Photo: Swamplot inbox