COMMENT OF THE DAY RUNNER-UP: THERE’S STILL A MISSING LINK IN THE BAYOU BIKE CONNECTOR “It’s not complete if you are trying to take the MKT Trail from the Heights into downtown and beyond while staying off streets. The Bayou Greenways interactive map still shows a dotted line for the missing connection between the MKT Trail and the stretch of the trail at Stude Park. When completed, that tiny section will make a big difference.” [Gretchen Lindquist, commenting on Houston’s Bayou Biking Connector Is Now Complete] Image: Bayou Greenways 2020
This connection was designed and a contractor selected and slated for construction in 2014. It had been put on hold for some reason and is not scheduled to be constructed until 2020.
Rumor has it that the lumber company that backs up to the trail at 5 1/2 St. owns the land. That would probably cause a problem.
The City bought the property.