An extra crane was spotted standing around in oncoming Kirby Dr. traffic on Saturday morning just north of Richmond Ave., helping to disassemble the tower crane that’s been used to lift pieces of the Kirby Collection’s under-construction office building into place over the last year-and-a-few-months. A representative from Thor Equities tells Swamplot this morning that the office midrise should be wrapped up by the end of 2017. The ellipse-footed residential tower (peaking over the top of the rectangular office building’s frame in the shot above) hit its full height earlier this month as well:
***
- Previously on Swamplot: Bowling, Bocce, Booze Headed to the Kirby Collection; Watch 7 Months of Kirby Collection Construction Race Into Place in 30 Seconds; Kirby Collection’s Next Step Forward Leaves a Giant Concrete Footprint; They Tore Down the Cafe Express and Funeral Bars on Kirby for This; Signs Herald Kirby Dr. Funeral Bars’ Impending Doom; The Jazzy New Bouquet of Towers Meant To Replace 4 Bars in 3 Buildings on a Kirby Block
Photos: Swamplot inbox