THE MENIL DRAWING INSTITUTE: 6 MORE MONTHS What’s been going on at the Menil Drawing Institute’s new building since its opening — originally scheduled for last October — was postponed over the summer? A lot of sensing and measuring: “It’s extremely important to monitor the climate control and the humidity gauges for a number of months to make sure there are no deviations,†the museum’s director Rebecca Rabinow tells the New York Times’ Andrew R. Chow., outlining what kind of ambiance is required for the paper works the structure will soon house. (Last year’s cold winter didn’t speed things up either — reports the Chronicle’s Molly Glentzer, killing off many of the new plants that had just been installed in the surrounding park according to the plan from landscape architect Michael Van Valkenburgh Associates.) Now that both the indoor and outdoor environments have been stabilized, the official opening date for the 30,000-sq.-ft. building designed by L.A. architect Johnston Marklee has been set: November 3. It will cap off a 3-year building process that began in place of the since-completely-demolished Richmont Square apartments’ backsisde off Branard St. The new structure’s first residents: 41 works on paper by Jasper Johns. [New York Times; previously on Swamplot] Photo of Menil Drawing Institute: Paul Hester/The Menil Collection