The first 2 waves of decorative railing are now stretching north off the edge of the new building at 2015 S. Shepherd Dr., the first half of the Shepherd Commons shopping center planned for the site. Per the renderings released back in 2013 , the 3rd and 4th waves should follow after the Hot Bagel Shop and River Oaks Nails jump ship from the original single-story strip center immediately to the north at 2009 S. Shepherd; after that, the old structure is slated for demolition to make way for part 2 of the new one.
Back in 2014, both businesses had plans to move into the space at 2015 S. Shepherd when it’s ready. (We Buy Gold, which wasn’t going to join in on the trip, has already been replaced in the old center by Cell Phone reStore).  Hot Bagel says it’s still planning to move in next door as soon as it can; a reader also spotted notice of an application submitted late last fall to sell food and drinks, including beer and wine, behind one of the site’s still-tape-dotted windows. The name on that application belongs to a corporate entity sharing an address with Fu Fu Restaurant in Dun Huang Plaza along Bellaire Blvd. at Beltway 8.
Visible in the background just south of the new building is kickboxing studio 9Round, followed by the Chipotle facing the corner of Shepherd with Indiana St. Here’s another look at what the center could look like after round 2 of construction gets knocked out:
CONTINUE READING THIS STORY
Bagels Rolling South