07/23/18 9:45am

PASADENA’S TALLEST ABANDONED BUILDING COULD SOON COME CRASHING DOWN A fitting symbol of Space Age industry and finance” — that’s how highly one First Pasadena State Bank brochure spoke of the firm’s new 12-story headquarters on Southmore Ave. after its construction in 1962. (Other local institutions agreed: for a while, its likeness showed up on Pasadena school report cards, reported Lisa Gray) Now, with the bank and all subsequent tenants long gone, the City of Pasadena is insisting in a lawsuit that the building’s owner tear the place down, or reimburse the city for doing so itself, reports the Chronicle. More than 10 year’s worth of code violations testify to the MacKie & Kamrath–designed structure’s unsoundness, claims the city. And a pile of citations issued over a slightly shorter period adds up to more than $65,000 (which officials seek to supplement with $1,000 per day as long as the building’s still standing in its current state). Inside the 2-story lobby, a fountain surrounded by curved glass walls has run dry. But on the outside, it’s still the tallest vacant building in town. [Houston Chronicle; more info] Photo of 1001 East Southmore Ave.: Patrick Feller [license]

07/19/18 4:00pm

In other abandoned Montrose restaurant news: crews have finished smashing up the Burger King on Westheimer a block west of Montrose Blvd., leaving the property in fast food limbo ahead of its planned takeover by Houston’s fourth Shake Shack location. Pictured above is the restaurant’s drive-thru lane minus the accompanying drive-thru infrastructure.

A Cherry Demolition excavator is still picking through scraps left behind from the teardown; they’re now spread out atop the former building’s foundation, visible below:

CONTINUE READING THIS STORY

Nothing-Burger
07/19/18 10:00am

It’s crunch time at the vacated original Café Ginger in the northern portion of the River Oaks Shopping Center, where a new 30-story apartment tower dubbed The Driscoll is planned to rise up over W. Gray St. Views from beyond the blaze orange barricades scattered around the parking lot since site work began in March show the crushing scene.

Since yesterday, the building’s been spilling its guts out onto the pavement in this particular area:

CONTINUE READING THIS STORY

The End of the Endcap