The pointy partially built retail shell spotted last August— empty, glassless, and seemingly left to fallow in the field at 4061 Spencer Hwy. — has since been covered over with the usual Krispy Kreme trappings, Lauren Meyers notes. Construction accessories were still parked on-site as recently as last week, and the grass growing freely beyond the Comerica Bank hedge was fully scraped away some time early this spring, presumably as part of the parking lot growth process. The site has yet to be added back to the company’s list of planned grand openings, however. And that other partially-baked location, just inside the South Loop west of Main St., was still wrapped in little more than its summer Tyvek as of Easter.
- Previously on Swamplot:Â The Pastoral Scene at Krispy Kreme’s Unglazed Pasadena Location;Â A Peek Inside the Half-Baked Krispy Kreme near NRG Stadium
Photos: Lauren Meyers