01/17/13 11:15am

Pelicans are symbols of self-sacrifice, said to pierce their own breast with their own beak to feed their young their blood. But the birds also have real big gullets — fitting, then, as the name of this 4,000-sq.-ft. restaurant under construction at 7819 Broadway in Galveston.

But the restaurant is just one part of the Pelican Rest Marina project developed by Harry Schulz. Across Offatts Bayou from Moody Gardens, the marina’s already operating as a fuel dock and weigh station. And construction is expected to begin soon on seaside condos:

CONTINUE READING THIS STORY

08/17/12 2:44pm

Over in La Porte, a Bayside Terrace home has — a bay-side terrace. The waterfront property has a panoramic view of Upper Galveston Bay and its existing spill islands and wildlife refuge. And that vista just dodged a soggy bullet: On Wednesday the Port of Commission nixed a plan that would have placed a 475-acre island of sludge in the bay in the middle of it, built from material dug up from dredging at the Bayport Container Terminal in neighboring Shoreacres, near the Houston Yacht Club. (The dredging will go ahead, but the material go onto berms at Atkinson Island instead.)

CONTINUE READING THIS STORY