- 4411 Sanford Rd. [HAR]
Having succeeded in somewhat reducing the planned amount of tree carnage at the southern end of their neighborhood bounding a portion of the Willow Waterhole Stormwater Detention Basin, residents of Post Oak Manor now have another curious byproduct of those flood-reduction efforts to contend with. Contractors working on the Harris County Flood Control District project are now lining a section of the new detention basin with actual barbed-wire fencing. “This is public paid-for lands,” complains neighborhood resident Valerie Runge. “I can’t help but feel this is retaliation for the trouble we caused trying to keep a few of the trees.”
That vague line of pink barely visible low in the forested area just beyond the backyard of this house on Warm Springs Dr. in Post Oak Manor marks a few of the hundreds of trees the Harris County Flood Control District plans to knock down as part of a second phase of work on the easternmost portion of the Willow Waterhole Stormwater Detention Basin complex. Most of the trees slated for removal are in a 5-acre zone to the southeast of Post Oak Manor (outlined at the bottom right of the aerial map below), just north of South Main St. and directly to the southwest of Beren Academy. But the pink line is part of a separate 2-acre strip that’s slated for thinning just south of Post Oak Manor. And that’s got some residents there — and in adjacent ‘W’ neighborhoods Willowbend, Willow Meadows, Willowbrook, and Westbury — upset.