Before his dog Teddy runs off with it, new Norhill resident John Whiteside finds a convenient doorstop solution: “None of the doors in my house close. Well, the closets do. But the actual doors into rooms – no. . . . It is a little more crooked than most Heights houses (which are always a little crooked, unless they’re new, in which case they will be crooked soon as the shitty modern constructions settles in). I would like it if the doors latched, but I’m not going to deal with that until I am sure there are no additional foundation repairs in the offing. This is normally fine because it doesn’t really bother me if I’m peeing and suddenly the door comes in and Teddy strolls in. ‘Hey, whatcha doin’?’ However, on Saturday I had people over for a little housewarming open house, and I realized on Saturday afternoon that guests might not enjoy Teddy visits during personal moments quite as much. What to do? Why, a doorstop seemed like the ideal answer. I looked around the house for a suitable heavy object. Then I had a great idea; there’s been a pile of red bricks sitting outside next to the air conditioning unit since I moved in. Solid, compact, easy to slide over in front of the door, and kind of rustic – the perfect doorstop!” [By the Bayou]
1031 Exchanges
Home Design
Houston Blogs
Houston Media
Mortgages & Financing
Neighborhood Associations
Property Research
Real Estate News
Sustainable Development & Green Design
Comment of the Day: How To Jack Your Own Bungalow
“Dude, it’s easy, just get a 20 or 30 ton bottle jack, the kind you can buy at any auto part or hardware store. . . . To raise a stack, just start a new one right next to it. I like to use the solid concrete blocks that [are] half the height of the normal ones. Pile those up to close the height of the jack, and then unscrew the thingie in the middle of the jack to bring it up to the beam. It’s a good idea to put a small piece of scrap wood between the jack and the beam, or otherwise you can make a little jack-shaped hole in your beam- probably not a big deal. Anyway, jack the beam up until you are able to put a shim in there- steel shims are nice, but hard to find, I just use wood for the smaller ones. Then you can let your jack down, and reset- the new stack your jack was on will have pushed itself down into the ground more than the house will have gone up, so you’ll need another shim or two under the jack before you start lifting again. Procede like this, adding more or larger shims, or concrete-block half pieces, until you get your floor the way you want it. . . . Important thing to keep in mind as you work is that the existing locations for the concrete blocks are already sitting on 80 years worth of soil compression. If you start a new stack somewhere else, and you don’t put some concrete down 3 or 4 feet, that new spot will sink over the next couple of years. So, just keep all the existing stacks, though you can add new stacks to cure a sag. On my house, when adding new stacks, I didn’t pour any concrete, I just dug down about a foot about put a 16″ x 16″ wide piece on the bottom, using a dollar-store level to make sure it was sitting in there flat. Ok, the redneck way to do this process is to lower the house, rather than raise it. Sure, this is easier but also moves your house that much closer to termite-ville, and closer in time to the moment when the beams are sitting directly on the dirt, which is kind of the dead-man-walking state for a wood framed house. And if you never raise your house, that day is a matter of when, not if, in this city of mud. . . .” [Patrick, commenting on Brick on the Inside]