03/26/15 11:00am

LATE MAY OPENINGS FOR SOUTHEAST AND EAST END RAIL LINES Metro Central Station, Main St., Downtown HoustonAn official opening date has finally been set for Houston’s 2 new light-rail lines — and it’ll be later than the expected early-April debut. The East End and Southeast Lines will both open May 23rd, the Metro board announced this morning. [Houston Metro on Twitter; previously on Swamplot] Photo of new Central Station downtown: Metro

02/11/15 2:15pm

After a year and a half of redrawing, presenting, and tweaking, Metro’s “reimagined” transit plan was approved by the transportation agency’s board today. The interactive map above shows the whole system in all its reconfigured glory, including the new rail lines currently scheduled to begin running in April. Bus routes will switch over to the above route system in August.

CONTINUE READING THIS STORY

All Approved for August
01/23/15 3:15pm

METRO PONDERS HOW TO SPEND A LIGHT RAIL SURPLUS Burnett Station, North Line Extension, HoustonWhat should Metro do with the extra $39.9 million it’ll end up with after the Southeast and East End rail lines open in April (on the 11th, it now looks like)? If the money isn’t spent, it’ll have to go back to the Federal Transit Administration, reports Dug Begley. $24.9 million of that would have to be spent on projects related to the year-plus-old North Line extension (the Red line), and $14.5 million would be restricted to use on the Southeast Line (aka the Purple Line). Among the proposals: building an elevated walkway between the bus transit center and the rail line at Northline; putting in extra parking at Palm Center, at the end of the Purple Line; shelters for bus stops near stations; an additional station on the Purple Line between Elgin and Leeland; safety or operational improvements, such as a restroom for train operators at a station; a crossing arm on Texas Ave. near Chartres St. [Houston Chronicle] Photo of Burnett Station: Skyline Art Services

09/25/14 12:00pm

COMMENT OF THE DAY: ODE TO THE SOUTHEAST LINE CLEARANCE TESTING REGIMEN Drawing of Light Rail Car, Houston“9:53 pm and I can hear the hollow, electronic train horn from my study window, the sad woot of the empty car. Despite the fact that I cannot ride the Metro train, it runs. Past me on my morning commute, it runs. Stopping traffic for 10 minutes on my way home. Always, it runs.” [crunch, commenting on Why Metro Trains Are Already Rolling Around UH] Illustration: Lulu

09/24/14 10:00am

WHY METRO TRAINS ARE ALREADY ROLLING AROUND UH Map Showing Testing Area for the Southeast Line, HoustonNo, the new light-rail lines won’t be ready to carry passengers anytime this year — if you’re looking for a ride, check again in 2015. But over the next couple of weeks, you may see a Southeast Line train or 2 skirting the western and southern borders of the University of Houston. Starting today, Metro will be shuttling vehicles along the path shown in red on the Purple Line map at left, from the corner of Elgin and Scott Streets through MacGregor Park to the vehicle storage facility just past the Palm Center Transit Center — for safety testing. Map: Metro

09/15/14 12:00pm

Designs for Overpass on Harrisburg Blvd., East End, Houston

Designs for Overpass on Harrisburg Blvd., East End, Houston

Metro has posted the latest designs for the enormous Hughes St. overpass along Harrisburg Blvd. on the far-east segment of the East End rail line. The $27-to-$42-million bridge is meant to carry cars and Green Line passengers over the Union Pacific East Belt freight rail line that runs north-south just west of Hughes St., between the soon-to-open East End line’s between the future Altic and Cesar Chavez stations. The posted design concepts, Metro notes, combine a “garden” wall and a wall noting a few 4-digit numbers important in the history of the neighborhood with a ribbon of white LED lighting above and blue accent lighting underneath and along the columns:

CONTINUE READING THIS STORY

At the End of the Green Line
08/01/14 3:00pm

Metro Light Rail Train on Capitol St., Downtown HoustonNo, no one’s expecting Metro’s 2 new light-rail lines to open any sooner than late December (as Swamplot reported last week), but some progress toward that goal is now visible on portions of the East End and Southeast lines: “Live wire” or powered testing of the downtown tracks began this week. The photo at right, sent in by a reader, shows a Metro train moving unescorted along the tracks on Capitol St. for the first time.

Photo: Nathan Juett

Power Up
07/21/14 1:30pm

Light Rail Station at Palm Transit Center, Houston

There’s still “some uncertainty” over the exact schedule, but all the pieces needed to allow Metro to open Houston’s second and third light-rail lines won’t be in place until late December, according to reports delivered to a committee of the transportation organization’s board of directors last Friday. Previously, an opening date sometime this fall had been projected for the Southeast and East End lines (though the far eastern end of the East End line won’t come on line until a newly planned overpass is built under over the Union Pacific East Belt freight rail line between the future Altic and Cesar Chavez stations). Delays in the delivery of trains aren’t the sole reason for the late openings, however.

CONTINUE READING THIS STORY

Waiting for the Trains
02/20/14 1:30pm

COMMENT OF THE DAY: HOW ABOUT A RAIL LINE ALONG THE BAYOU? Rail Line Along Memorial Dr., Buffalo Bayou“I always thought a line down Memorial Drive along Buffalo Bayou would be awesome. It seems like it would be pretty easy to adapt the stretch of Memorial from downtown to Shepherd in to a rail friendly street — there are pedestrian crosswalks already, abundant lanes, and no stop-light intersections to contend with. They could take a lane or 2 from Memorial Drive, make a new right of way down the park, or even make an elevated line (which all of them should have been). The stops could tie in with cross streets or some the existing pedestrian bridges. This could be a real ‘showcase’ line for the city being right next to what seems to becoming Houston’s prime inner city park location. The line could continue all the way into Memorial Park and maybe even somehow get to the Galleria. And of course Swamplot is the best forum for me to lobby my vision.” [actualarch, commenting on What’s the Point of Metro’s New Buffalo Bayou Bridge Under I-45?] Illustration: Lulu

02/19/14 10:45am

Metro Bridge over Buffalo Bayou, West Downtown, Houston

A reader who’s been watching construction of the new bridge that’s gone up over Buffalo Bayou and fitted neatly under I-45 at the far western end of the new under-construction Southeast and East End light-rail lines wonders what its purpose is. The bridge is beyond the planned Theater District stations, the last shared rail stops for the 2 lines. Is it a bridge to nowhere, or the starting point for some later western expansion along Washington Ave?

CONTINUE READING THIS STORY

Heading West from Downtown
02/06/14 12:30pm

Repair Work on East End and Southeast Rail Line on Capitol St. Near LaBranch, Downtown Houston

As noted in this morning’s Headlines post, yesterday Metro toted around some trains for “clearance testing” on the eastern stretches of the East End and Southeast rail lines scheduled to open later this year, in advance of electricity being brought down the lines. But downtown, repair continues on a 200-ft. stretch of track shared by the 2 lines on Capitol St. between LaBranch and Crawford — where the rails “probably shifted during concrete placement” and therefore didn’t set properly, a spokesperson for the transit agency tells Swamplot. The concrete has been torn up so the stretch can be rebuilt, level. The rework is being paid for at no cost to Metro by the contractor, Houston Rapid Transit, and will not cause any delay in opening the lines, the spokesperson says.

Photo: Swamplot inbox

Get This Straight
12/27/13 12:45pm

Repairs on Metro Southeast Line at McKinney, Houston

Why were crews yanking out and replacing a brand-new 240-ft.-long stretch of rail and concrete on the not-even-opened-yet Southeast Line at McKinney St. (above), next to the Columbia Tap trail in East Downtown, earlier this month? Because back on May 30th, a 7.2kV CenterPoint Energy electrical line fell onto the tracks and their overhead line three-quarters of a mile to the south, at Scott St. and Coyle St.

Zzzzzzap!

In addition to the McKinney St. burnout, 20-ft. sections of rail and track slab got zapped near crossings at Nagle St. and Elgin. At the incident site, 80 ft. of concrete and anti-vibration insulation had to be scrapped and replaced.

CONTINUE READING THIS STORY

Hot Rails
12/18/13 12:45pm

Installation of Red Line Signage, Preston Station, Main St. Line, Houston

For 10 years, you’ve known it as Houston’s only light-rail line, so what did it matter that we called the Main St. line? But in advance of 2 separate advance lines opening up next year, it’s got a color too: The Red Line. You can see workers installing signage with the “Red Line” designation in the photo above. When was that photo taken?

CONTINUE READING THIS STORY

Metro’s New Colors
12/16/13 10:00am

SNøHETTA’S CENTRAL STATION CANOPY DESIGN IS OFFICIALLY DEAD Proposed Design by Snøhetta for Downtown Central Station, Main St. Between Capitol and Rusk, HoustonWhatever glimmer of hope supporters of a distinctive Central Station were holding out for Metro somehow following through on its design competition or for Snøhetta’s winning canopy design have officially been dashed, Dug Begley reports: “Metropolitan Transit Authority chairman Gilbert Garcia and interim CEO Tom Lambert confirmed [last] week that timing crippled any chance of resurrecting a winning design. Instead officials will build their basic canopy for the block-long stop between Capitol and Rusk streets on Main Street.” [The Highwayman; previously on Swamplot] Rendering: Snøhetta

11/25/13 10:30am

Proposed Design by Snøhetta for Downtown Central Station, Main St. Between Capitol and Rusk, Houston

Craig Dykers of Norway-and-NYC architecture firm Snøhetta tells Chronicle reporter Dug Begley his firm has been working for more than a year on its own and with local contractors to lower the construction costs on his firm’s competition-winning design for Metro’s Central Station canopy — in between its work, that is, on a little reconstruction project for New York called Times Square. Snohetta’s design for a canopy made of thin layers of concrete was meant to highlight rainfall, making falling water “a feature of the design.”

CONTINUE READING THIS STORY

Train on Main