08/20/18 5:30pm

The Tudor-revival mansion that sits along the bend in I-45 at 2000 Smith St. has been sold to the owner of several car dealerships, including Central Houston Nissan on the S. Loop off the S. Main/Buffalo Spdwy. exit and Central Houston Cadillac off McGowen St. between Travis and Main. Prior to the closing earlier this month, Preservation Houston reported that the buyer didn’t plan to keep the house standing.

Nine blocks away from it, the new owner Ricardo Weitz also has all 3 of the parking lots that surround his Cadillac dealership to the north, east, and west. He purchased the mansion through an entity he owns called Central Houston Auto Properties II.

Photo: Preservation Houston/The Heritage Society

The House off I-45
08/20/18 2:30pm

The title of artist Joan Dodd’s new composition 88 Keys undersells it — it’s actually 275 keys, more than 3 times the amount found on a piano. Installation artists laid them down along the rounded east west side of Jones Hall over the weekend. Constructed from 900 pounds worth of temporary marking tape  — the kind commonly used on highways — they now span the entire block of Louisiana between Texas Ave. and Capitol St.

That material choice means they can really take a pounding from anyone who feels like stomping out a silent melody with their feet while heading south to check out the Bank of America Center’s ongoing renovations. Or those lured in by the glow of the Lyric Center parking garage’s new lighting, pictured off in the distance below:

CONTINUE READING THIS STORY

Sidewalk Chromaticism
08/15/18 3:30pm

RECENTER REBUILDING GETS GOING ON MAIN ST. Midtown sobriety nonprofit ReCenter — formerly the Men’s Center — is now getting started building a new building in place of its old campus at 3805 and 3809 Main St. BRAVE Architecture’s design for the new housing, education, and detox facility — shown above fronting the Red Line — hasn’t taken shape yet, but a big hole recently has, according to a passerby, foreshadowing the coming construction. Since demolishing the 2 structures previously on site, the center’s been operating out of the former gas station convenience store just east on the block, at the corner of Fannin and Alabama. (Some additional office space is also tucked inside a converted home at 3816 Fannin.) [Previously on Swamplot] Rendering: BRAVE Architects

08/15/18 10:15am

A CURTAIN CALL FOR THE HIDDEN WESTERN UNION BUILDING BEFORE BANK OF AMERICA CENTER DIGESTS IT? With workers now punching holes in the facade where the Bank of America Center wraps the dead Western Union building it swallowed in 1983, city planner David Welch asks the question: “Will we be able to see the hidden building during construction?” It should be hard to miss; according to one Swamplot reader: “It is completely intact, tar and gravel roof included.” Size-wise, it takes up nearly a quarter of the B of A building’s ground floor, its northeast corner wrapped by the skyscraper’s own at Lousiana and Capitol streets — where the new openings are taking shape now. But its emergence may be brief: Once the planned new restaurant and cafe get situated inside it, the structure’s time-capsule mystique will be gone. And after new interior entrances open its innards to the tower’s own central lobby corridor, the telegram building will be completely metabolized. [David Welch; previously on Swamplot] Photo: David Welch

08/14/18 10:00am

Crews are now coating the garage on the corner of Travis and Rusk with strips of glass curtain wall similar to those seen on its much taller neighbor to the north, the Capitol Tower. While the 35-story office building got its exterior finish soon after topping out in April, the garage — built 2 years earlier — was left naked. It took over from the former Houston Club garage Skanska expanded and then demolished on the block in 2015.

Even after construction wrapped up, the new parking structure viewed below from Milam still looked mostly like this:

CONTINUE READING THIS STORY

First Come Last Serve
08/10/18 12:00pm

RICE PICKS UP 1.75 MORE ACRES NEAR WHEELER TRANSIT CENTER, STRIPPED-DOWN SEARS A pair of entities connected to Rice University have purchased some extra property near the molted Midtown Sears the school bought along with 3 adjacent acres last year. Included in the deal: the surface parking lot at 4510 Main St. — west of the Wheeler Transit Center — the Shipley Do-Nuts on the corner of Richmond, and the Gulf station next to the Spur 527 overpass. Nothing’s gone down on the land recently except for the gas station; it was demolished in June. But A long list of proposed Houston residential developments put out by mortgage bank Berkadia — now being passed around on HAIF — shows the surface parking now slated for a 243-unit highrise from developer Horizon Real Estate. Last time someone planned to do something with that parcel, ground-floor retail was in the mix, too, with 327 units of affordable housing upstairs. [Berkadia via HAIF; previously on Swamplot] Photo: Lou C.

08/03/18 12:45pm

A new brewery is now in the works for the industrial building that sits across the Downtown 59 on-ramp from the Houston Center for Sobriety. Just like the adjacent drunk tank which opened in 2013, the new business at 100 N. Jackson will be housed in a repurposed warehouse. Its lawn includes several signs pointing drivers to the neighboring sobering center — like the one shown above fronting the exit ramp off the Eastex, on the west side of the soon-to-be beer venue dubbed Industry Brewery. (Also in the frame: signage for the building’s most recent tenant the American Engine & Grinding Company.)

At that corner, a left on Ruiz St. followed by another quick one on Chenevert gets you outside the recovery facility:

CONTINUE READING THIS STORY

Downtown Wet and Dry Spots
08/01/18 4:30pm

Dump trucks are now filing onto the barricaded block once home to the Houston Chronicle building — and more recently a parking lot — at Texas and Travis to start laying the foundation for Hines’s new 47-floor tower and soon-to-be new global headquarters. The photo above views the traffic from way up on the 31st floor of the site’s catty-corner northeast neighbor Aris Market Square — which the new building will overtop along with pretty much everything else nearby except the Chase Tower directly south of it. Law firm Vinson & Elkins will occupy the building’s top 7 floors.

A series of glassed-in atria shown in the rendering above from architecture firm Pelli Clarke Pelli hang out along the structure’s edge facing Milam St. Viewed from closer up, you can even see some people and trees inside them looking out on what’s below:

CONTINUE READING THIS STORY

Dump Truck Parade
08/01/18 1:00pm

After and before views show off the dramatic change of face that’s transformed 311 Travis St. as part of the prep-work for its new Tiki-themed bar occupant Kanaloa. The monochrome makeover began on the lower façade a few weeks ago before proceeding upstairs where it wrapped up last week. “We want this to be a hidden oasis in downtown,” the venue’s owner told Eater in March, hinting at plans to renovate the 126-year-old Alltmont Building. Its canopies, window arches, and pediment are pretty well-hidden now — though the building does seem to stand out a bit as a whole amid the row of adjacent lighter brick structures fronting Market Square Park.

When Kanaloa opens, it will pick up where Market Square Bar & Grill — pictured below — left off last year:

CONTINUE READING THIS STORY

Tiki Torched
07/31/18 4:15pm

COMMENT OF THE DAY: NEW ART SUPPLY WILL CROP UP SOMEWHERE OFF MAIN ST. AHEAD OF PLANNED HIGHRISING “The owners of Art Supply are moving to a new location. This is a successful store, and the owners have no intention of closing up and retiring. In addition, this building has been used as studios for artists for decades as well as a location for art classes. Their new location will also have art studios.” [Robert Boyd, commenting on Australian Developer Now Has All 3 Midtown Blocks Lined Up for Incoming Highrise Trio] Photo: Keaton Joyner

07/31/18 10:00am

The owner of 306 Main St. is now marketing the building for lease, which means Moving Sidewalk‘s days are numbered inside. The bar took over from ramen restaurant Goro & Gun, which took over from Mediterranean spot Molto, which took over from Grum Bar & Grill, which took over from Hic-Cups Bar & Grill.

The biggest cosmetic change to the building over that roughly-10-year time span: the reddening of the church-like, windowed tympanum up above the front doors. Prior to Goro & Gun’s arrival, it’d been brown along with the entryway below it — both of which look out on the southbound Preston St. platform of METRO’s Red Line.

Photos: LoopNet

Rail Drinks
07/27/18 1:45pm

Here’s another Midtown development development: Georgian breakfast restaurant Flying Biscuit Café is the first tenant to line up for a spot in the tower Caydon Property’s putting up off Main St., between Drew and Tuam streets. The 27-story building — viewed above from the east side of Fannin St. — is just south of the Art Supply on Main store that Caydon just recently snatched up and plans to replace with one in the threesome of towers that’ll eventually stretch up to McGowen.

Flying Biscuit’s other destination as part of its 2-pronged Houston entrance strategy: the west side of the strip on Kingsride Ln. off Gessner where Reginelli’s Pizzeria decamped earlier this month:

CONTINUE READING THIS STORY

Flightplans
07/27/18 9:45am

AUSTRALIAN DEVELOPER NOW HAS ALL 3 MIDTOWN BLOCKS LINED UP FOR INCOMING HIGHRISE TRIO The Australian developer planning a trio of towers and lower-level retail on 3 adjacent Main St. blocks recently bought a chunk of the middle one — now home to Art Supply on Main — giving it free rein over the entire zone it wants to rebuild between McGowen and Tuam streets. Earlier renderings (since yanked from the interwebs) showed that 30,000-sq.-ft. middle parcel off Drew St. housing a highrise with signage for “The Drew Hotel” and Aussie brewery Little Creatures. The art store doesn’t plan to move out until next spring, says the developer Caydon Property, so any transformative tower work will have to wait. But in the meantime, construction’s already gone vertical on the block directly south of it, where a 27-story building is taking the place of the former Mental Health and Mental Retardation Authority campus torn down last year. [Previously on Swamplot] Photo of Art Supply on Main: Keaton Joyner

07/26/18 3:30pm

COMMENT OF THE DAY: A BLANK CANVAS ON TRAVIS AND COMMERCE “In the meantime, can someone please put a mural on that god-awful concrete wall on the parking garage behind it? It really ruins taking shots of downtown from that angle now.” [Triton, commenting on Injury Lawyers Give Up Waterlogged Abraham Watkins Building’s Ground Floor for Good, Parking Garage Filler Now Slated To Replace Them] Illustration: Lulu

07/26/18 2:00pm

Catty-corner to the soon-to-be aerated Spaghetti Warehouse building on Commerce St., its 2-story brick neighbor between Travis and Milam has a similar plan for dealing with its own floody first floor: get rid of all downstairs law offices and replace them with parking. Currently, the decades-old Abraham Watkins Building is bookended by 2 surface parking lots to the east and the west (pictured above). By filling in the gap between them with 14 more spots, the owner hopes it’ll no longer have to keep repairing the decades-old place like its done at least once yearly for the past 4 years, according to an application it filed this month. (Personal injury firm Abraham, Watkins, Nichols, Sorrels, Agosto & Aziz has managed to stay safe in the building throughout that time, though staff retreated to the top floor after Harvey.)

Houston’s historic commission approved that application yesterday, clearing the way for this new garage door to crop up on Commerce in place of the center storefront panel as shown below:

CONTINUE READING THIS STORY

800 Commerce