06/30/16 12:30pm

Beltway Crossing Northwest Construction Progress, April 2016 Beltway Crossing Northwest Access Map ExcerptMost of the square box just left of center in the above photo was officially leased by Amazon yesterday, reports Cara Smith for the HBJ. The deal is for roughly 100,000 sq.ft. in the Beltway Crossing Northwest business park, located on the other side of 249, Greens Bayou, and an AMC Theater from Willowbrook Mall (as seen in the access map and intended eventual site plan from developer Panattoni). The agreement on the park’s Buildnig 5 was reportedly made official within 24 hours of the commissioners court’s Tuesday vote to approve a larger-than-normal tax abatement deal for a different Amazon facility — the proposed 855,000-sq.-ft. warehouse in Pinto Business Park (catty-corner across Beltway 8 and I-45 from Greenspoint Mall). But building permits naming Amazon as the occupant of the Willowbrook site at 11720 N. Gessner Rd. date back to at least 2014.

Here’s a shot of the Pinto site — the park’s 971 acres lie in place next to the Houston National Cemetery (the yet-unoccupied eastern end of which is visible on the far right in the south-facing aerial below):

CONTINUE READING THIS STORY

06/27/16 12:15pm

COUNTY WANTS TO FILL IN THE ASTRODOME’S FLOOD LEVELS WITH PARKING AstrodomeThere are still no set plans for what will eventually happen to the Astrodome, but the county is already gearing up to work on the parking situation. Tomorrow the county commissioners court will look over an engineering report on plans to raise the main floor of the structure (which currently sits some 30 feet below the surrounding grade) and stick a 2-story 1,400-space parking garage beneath it. The meeting’s agenda indicates that approvals on specifics for the roughly $105 million plan won’t be put to a vote until September; a spokesman for county judge Ed Emmett also tells Mihir Zaveri that no construction would start until after the Super Bowl, regardless of approval. [Houston Chronicle; previously on Swamplot] Photo: Russell Hancock via Swamplot Flickr Pool

06/21/16 3:00pm

Proposed Dedicated Bus Lanes on Post Oak Blvd., Uptown, Houston

The Uptown PAC angling to stop both a planned Dinerstein highrise (which they say would increase area traffic) and the Post Oak Blvd. dedicated bus lane project (designed to reduce area traffic) has been ramping up for a legal fight lately: On Monday the organization asked the city to stop approving permits for any new highrise developments in the area, and to stop work on the bus lanes, both pending the completion of a new traffic study. Paul Takahashi writes that the group is also taking legal fund donations and looking at filing lawsuits over the matters.

What is the PAC worried about, exactly? Back in 2014, when the group formed to fight the bus lane project and a nixed AmREIT tower previously planned next to the Cosmopolitan condos (where many of its members reside), spokesman for the group said it was worried that ambulances wouldn’t be able to quickly move through increased gridlock stemming from additional development. The talking points have expanded significantly since then; now ABC 13 reporter turned hired investigator-slash-media-attention-consultant Wayne Dolcefino is on the case (the self-consciously horse-centric video below was released late last month), and recent talking points even include calls for the bus lane money to be used to fix flooding issues in not-in-Uptown Meyerland and Greenspoint instead:

CONTINUE READING THIS STORY

Stop Requests on Post Oak
05/19/16 2:15pm

EL REY’S OAK FOREST LEASE IS UP AT THE END OF THE YEAR El Rey at 3330 Ella Blvd., Oak Forest, Houston, 77018The site plan for the 33 1/3 @ Thirtyfourth retail development [which — disclosure — has been sponsoring Swamplot for part of this week] shows new construction directly on top of El Rey Taqueria’s Oak Forest branch at the corner of W. 34th St. and Ella Blvd.  Crescere Capital bought the land beneath the drive-thru Cuban-Mexican taqueria-coffee-house last April, though the company has been collecting other parcels on both sides of 34th east of Ella since at least early 2014. As of now, El Rey’s lease is scheduled to run out in December, before a scheduled January construction start for the retail center. El Rey currently operates 3 other locations: along Washington Ave., along Hwy. 6 south of 290, and across I-10 from Memorial City Mall. Photo of El Rey at 3330 Ella Blvd.: Stephen G.

03/30/16 12:45pm

Foundation pour at 1111 Rusk St., Downtown, Houston, 77002

Rendering of Houston Luxury Apartments, 1111 Rusk St., Downtown, Houston (3)

Above is the after shot of the foundation pour that wrapped up late yesterday morning behind the former Texaco building currently getting made over as The Star at 1111 Rusk St. The pour started around 10pm on Monday night, a reader reports from up above the scene, noting that crews have been laying rebar for the last few weeks. The square-ish foundation was put down on the western end of the rectangular footprint of the parking garage planned to run from Fannin to San Jacinto along Capitol St.; renderings released in 2013 show a residential highrise tower growing out of the top of that part of the structure.

Downtown Houston’s page on the project still shows a rendering that includes the tower, which was of undecided height (so long as it was at least 20 stories above the parking garage) as of 2013. The current project description makes no mention of the planned highrise, however, and the rendering of the project on designer Hnedak Bobo Group’s site, currently shows only the planned parking garage, with the parking capacity estimate bumped up to 750 spaces:

CONTINUE READING THIS STORY

Mat Pour On Capitol St.
03/24/16 4:45pm

COMMENT OF THE DAY: LEASING THE SKY AND OTHER ACTS OF VANTAGE PRESERVATION Planned Development“Only guarantee to protect your view is to buy the air rights. (Not sure it is possible, but you can buy mineral rightswhy not air rights?) Maybe this will be a new trend in real estate, to protect and guarantee views. Otherwise, buy the land so you can determine what does and does not go up.” [HouCynic, commenting on Cosmopolitan’s Condo Association Preemptively Sued by Would-be Nextdoor Highrise Developer in Uptown] Illustration: Lulu

02/23/16 5:00pm

3773 Richmond Ave., Greenway, Houston, 77046

A reader sends this fresh snap of the in-progress tower towering at 3773 Richmond Ave, where a glass skin is now growing on the northern facade. Those top stories now getting glassed in will be occupied by out-of-the-region Regions Bank; the compound will be named Regions Financial Center to match.

The 11-story office tower just west of Timmons Ln. has been working on looming dramatically over next-door single-story hand carwash Soap since December of 2014, and is expected to wrap up some time next quarter. In the meanwhile, here’s a video tour of what the whole thing could look like — including a cameo appearance by a Jenni’s Noodle Shop in a ground-floor retail spot (around 30 seconds in):

CONTINUE READING THIS STORY

Regions on Richmond
02/19/16 10:15am

Proposed Development at Yale and 21st streets, Heights, Houston, 77008

Proposed Development at Yale and 21st streets, Heights, Houston, 77008Here’s the latest cloud-edged rendering of what could be coming to the corner of Yale and W. 21st streets, if Wellington Development gets its requested setback variance wish granted. A reader noticed the notice of the request posted outside of the building currently at 2105 Yale, which formerly housed Dorsey’s Beauty Academy prior to a decade of abandonment.

Wellington bought the spot last July, around which time Collum Commercial put out a leasing flyer showing a new floor-slash-parking plan for the property, which is boxed in on the non-Yale-and-21st-streets sides by the 2125 Yale apartments. Planned renovations to the building, which is listed in county records as 13,000 sq.ft.,  appear to involve some major trimming and resculpting to fit in new off-street parking spaces:

CONTINUE READING THIS STORY

Yale Street Plaza
02/17/16 12:30pm

Former Greenleaf Gardens, 803 Kipling St., Audubon Place, Houston, 77006

Former Greenleaf Gardens, 803 Kipling St., Audubon Place, Houston, 77006Greenleaf Gardens appears to be getting ready for some less-communal, more-perennial planting on the corner of Kipling and Stanford streets in Audubon Place. A reader snapped a few photos at the former community garden last week, including a picture of the sign announcing an application for a certificate of appropriateness for new construction in the historic district. That application is in the name of Greg Swedberg of 2Scale Architects, on behalf of Michele Alvarado of Sanctuary Builders, which bought the property last fall after the city decided not to buy the land and turn it into a park.

The paperwork for the certificate includes sketches and and plans for the 2-story duplex in the works for the space, which may need to be revised to something a little more neatly rectangular, based on late-January feedback from the Houston Archaeological and Historical Commission. Here’s a view from the corner of Kipling and Stanford, as submitted on January 6th:

CONTINUE READING THIS STORY

Turning a New Leaf
08/01/13 4:15pm

MONTGOMERY COUNTY MASTER-PLANNED COMMUNITY PICKED FOR MIDDLE-AGED DISTRICT Arizona homebuilder Taylor Morrison has just purchased 700 lots in the master-planned community Woodforest a few miles north of The Woodlands, and the Houston Business Journal reports that these lots — for which prices and plans are not yet available — in Johnson Development’s 3,000-acre community will be reserved for residents 55 and up. But this doesn’t appear to mean that Taylor Morrison, which is also building in Springwoods Village south of here, will be putting anyone out to pasture, writes Bayan Raji: “It’s committed to the homes fitting in.” [Houston Business Journal; previously on Swamplot] Photo of Riverbend in Woodforest: Woodforest

02/28/13 5:00pm

A result of the news yesterday that H-E-B will be moving from its Fountain View and Westheimer store to a new one on San Felipe in 2014 is the impending demolition of Tanglewood Court apartments, which stand on the 18-acre property bound by Fountain View, San Felipe, and Inwood. (The photo shows the apartments from the corner of Fountain View and Inwood.) Lynn Davis of Fidelis, which purchased the site in September 2011, tells Swamplot that notice has been given to residents that they’ll need to move by the end of March or early April. Buses from neighboring complexes, says Davis, have been shuttling them around to help them find a new place to live.

And once they’re gone, what, besides the H-E-B, will go in their place?

CONTINUE READING THIS STORY

02/27/13 12:00pm

HALF THE $25.8M NEEDED FOR MIDTOWN ARTS CENTER RAISED Looks like the money for that proposed theater and gallery complex on Main St. keeps rolling in, reports the Houston Chronicle: “Fundraising up to now,” reports Flori Meeks, “has yielded about $12.3 million.” But the little meter on the website for the Midtown Arts and Theater Center Houston — or The MATCH for short — says that the troupe-friendly group already has $13.2 million; that’s 51 percent of the $25.8 million needed to get started on the Lake Flato- and Studio Red-designed building (shown here) on the existing surface parking lot that’s bound by Main, Travis, Francis, and Holman. And what’s it going to be when that other $12.6 million’s in pocket? “While designs have yet to be finalized,” reports Meeks, “current plans for the 59,000-square-foot building call for a large 350-seat theater, three black-box theater spaces with flexible seating configurations, two rehearsal spaces that can also be used for performances and exhibits, a large gallery area, more than 6,000 feet of office space, a central public breezeway that can be used for performances and exhibits and a coffee and wine bar.” [Houston Chronicle; previously on Swamplot] Rendering: The MATCH

02/14/13 2:00pm

Yesterday, city council approved an agreement that will allow Southwest Airlines to go ahead with plans to expand Hobby Airport for international flights. The short-pants airline will foot the $150 million bill to add up to 280,000 sq. ft. to the terminal, including a new concourse and ticket counter, six security lanes, five gates, and a customs inspection hub. The plan, pictured above, also includes restructured roadways and a new parking garage with 2,500 spaces, mutating one of the wings of an airport designed as though it might be itself ready for takeoff:

CONTINUE READING THIS STORY