

The rendering at top of a new West-Loop-fronting hotel shows 2 different signs adoring its upper facade: one for Holiday Inn Express, the other for Staybridge Suites. Both brands will be housed under one roof in the planned 14-story building that’s due to crop up between Public Storage and the Stages Stores corporate office building north of Westheimer and east of the West Loop. On the second floor, you can see the pool deck that’s planned. No word yet on how that outdoor area or the building’s 319 rooms will be divvied up between the 2 brands, or if there will be any distinction at all.
InterContinental Hotels Group is the corporate overlord behind both Staybridge and Holiday Inn. Its logo makes a sly appearance on one of the flags in the rendering.









A construction boss who oversaw work to turn the Melrose Building on the corner of Walker and San Jacinto into the new-ish Le Meridien Hotel has been indicted for his role in a scam to embezzle $3.4 million from his employer — The Beck Group — during its renovation of the structure. “[Moses] Said was picked to manage construction at the Le Meridien Hotel from 2016 to 2017,” reports the Chronicle‘s Gabrielle Banks. “
“My dad was the innkeeper when the Holiday Inn opened, and we lived in the building for a couple of years. It was quite a place — with the Orbit Lounge, one of A. J. Foyt’s Indy cars in the lobby, and so on. But its day has passed.” [

“Before I left work, a guy was at the very top pulling a long rope he had tied to a wooden structure hanging on the corner of the building. It looks like a homemade trebuchet. I’ll keep posting updates if anything major happens; hell, it’s in my sight line all day.” [
The latest purchasers of the recently-renovated Lancaster Hotel hotel at 701 Texas Ave. had
A reader in the KBR Tower 2 blocks east of the former Days Inn at 801 St. Joseph Pkwy. reports sightings of several different crews that have appeared outside the north face of the hotel within the past week. A pair of crane trucks have been parked at the foot of the hotel’s garage, and a swing-stage scaffold is hanging near the top of the podium. Also noted: Workers have cleared out debris from inside the garage, and accumulated trash has been removed from the pool of the 31-story 




