
The rapidly disappearing elevated segment of Elysian St. pointing north out of Downtown is the latest aging roadway structure to be crumbled apart, though it won’t be the last. But death is a natural part of the Houston roadway cycle! And a healthier, brawnier replacement viaduct is planned to take its place along roughly the same right-of-way — this one with broad shoulders and a sidewalk. TxDOT spokesman Danny Perez told Houston Public Media‘s Gail DeLaughter last month that work on the new structure, which connects Downtown to Near Northside by funneling drivers over Buffalo Bayou and I-10, should start before the demo of the mile-and-a-half-long original wraps up.
A hunched excavator was spotted helping to bring the aging bridge down from above:






The judge judging the 


The city and the developers of White Oak Music Hall have hammered out an agreement over the outdoor stage 



The city isn’t planning to renew a permit for White Oak Music Hall’s temporary-but-