04/23/15 5:30pm

Proposed Changes to I-45, I-10, and I-69, Houston

There’s so much to talk about and gawk at in the latest “proposed recommended alternatives” for reshaping I-45 now being shopped around by TxDOT and a host of freeway-happy consultants — enough for a fourth round of public meetings scheduled for tonight and next week, plus hours of extra-curricular speculation. The plans encompass dramatic changes to the North Freeway all the way from Beltway 8 to a new split adjacent to the Third Ward, including eye-opening widenings, all sorts of exciting tunnels and high-flying overpasses, a slew of spaghetti-like interchanges, and — the pièce de résistance — the wholesale give-up of I-45’s current L-shaped wrap around Downtown, including the Pierce Elevated.

These 5 images from our highway overlords’ exciting imagined future sum it up best:

1. The X-ing-out of the Pierce Elevated (diagrammed above). If the elevated portion of I-45 along the path of Pierce St. goes away, how will anyone be able to tell where Downtown ends and Midtown begins? Don’t worry, a few proposals are being shopped around to turn a de-automobiled structure into a High Line—like public park or bikeway. (Though much bigger, ′cuz Houston.)

CONTINUE READING THIS STORY

Freeway Frenzy!
04/23/15 2:00pm

Demolition of Former Shopping Center, 9714 Buffalo Spdwy., Houston

Crews are already at work (above) removing asbestos from the vacant shopping center at 9714 Buffalo Spdwy., one block up on S. Main St. from the South Loop and a mile and a half west of the Astrodome. Plans have already been made for the 1.26-acre property, as well as for the former America’s Best Value Inn immediately south of it at 9604 S. Main St. An entity controlled by developer Frank Liu bought the motel and its 3.13-acre lot in January, and pre-demolition activities are going on there now too.

CONTINUE READING THIS STORY

Only the Starbucks Will Remain
04/23/15 12:00pm

Landry's Proposed Post Oak Hotel Complex, 1600 West Loop South, Galleria, Houston

“Remember, I’m the guy that took the old fire station and made it an aquarium,” Tilman Fertitta explains to Nancy Sarnoff. “I took the old Flagship and made it the Pleasure Pier. I took an old fishing village and made it the Kemah Boardwalk.” All of which might help explain the simple concept behind the Landry’s CEO’s latest venture: taking a surface parking lot next to the Landry’s corporate headquarters near the Galleria and turning it into a 35-story hotel-apartment-office-tower with a 2-story auto showroom in front, then filling out the rest of the 10-acre site with a parking garage and couple of pad-site restaurants facing the West Loop southbound feeder.

A row of 4 large lit-up diamonds facing east across the freeway will festoon the forehead of the Gensler-designed tower at 1600 West Loop South. Fertitta calls the not-really-a-sign a “subtle message.” It’s meant to stand in for the 4 diamond shapes in the Landry’s logo — dining, hospitality, entertainment, and gaming — though until a few pesky laws can be changed not all can be offered on site.

CONTINUE READING THIS STORY

Landry’s Post Oak
04/22/15 2:00pm

WHEN SYSTEMS BREAK DOWN East Downtown, HoustonA reader writes: “The non-profit I work for is currently looking for a new office. We found a great location in East Downtown, near the new rail line, recently renovated, and a great price. It is essentially our dream office. During the lease negotiations the realtor said that after 90 days into the 3 year lease, if any plumbing, electrical, or HVAC issues arise, we would be responsible for paying it. Including any replacement and labor. When countered with a ‘no,’ the realtor stated that this was a normal practice in Houston and ‘good luck trying to find a place that will let you get away with that.’ Being new to this process, we are curious if this is true. The current office we are in does not require that and I personally have not heard of it other places.” Photo: Russell Hancock

04/22/15 1:00pm

Demolition of Former Riviana Foods Processing Building, 1702 Taylor St., First Ward, Houston

A portion of the Riviana Foods complex at Summer and Taylor Streets in the First Ward was torn down this week. Reader Rony Canales’s panoramic photos of the former Riviana processing building and a few accompanying structures show the demo in process (above) and a little further along in the process (below):

CONTINUE READING THIS STORY

After the Rice Is Gone
04/21/15 5:15pm

Rendering of Arábella Condo Tower, 4521 San Felipe St., Highland Village, Houston

The folks at BuzzBuzzHome pass on this hot-off-the-email rendering of the 34-story condo tower Randall Davis is planning for a piece of the former Westcreek Apartments site along San Felipe just inside the West Loop. Dubbed the Arábella, the 116-unit building is meant to sit at 4521 San Felipe St., directly across the street from Ashley Furniture. The proposed highrise’s immediate neighbors — including Target and the almost-complete 25-story SkyHouse River Oaks apartment tower immediately in back of the property — are artfully represented in the rendering by a small forest.

Rendering: Randall Davis Company/Argali Partners

Highland Village Highrise
04/21/15 12:00pm

EATSIE BOYS SPACE ON MONTROSE WILL GO CREPE Eatsie Boys, 4100 Montrose Blvd., Montrose, HoustonMelange Creperie will be taking over for the Eatsie Boys at the 1,200-sq.-ft. former Kraftsmen Bakery space in the same ivy-covered Campanile complex that houses the Black Lab at 4100 Montrose Blvd., according to a quartet of local media reports. The Montrose crepe stand raised $52,000 toward a move indoors in a Kickstarter fundraising campaign earlier this year. After its lease on the property ends at the end of this month, Eatsie Boys will continue to operate its food truck, but the team behind it plans to focus on its other venture, the 8th Wonder Brewery. [Culturemap; previously on Swamplot] Photo: Local Sugar

04/21/15 11:00am

Construction of New Starbucks Drive-Thru at 8819 Katy Fwy. at Brogden Rd., Hedwig Village, Houston

Former Village Mobil at 8819 Katy Fwy. at Brogden Rd., Hedwig Village, HoustonHeaded into the Loop along I-10 and missed the exit for the Starbucks in the shopping center at Echo Ln.? Construction has already begun on your new inbound coffee-stop backup. The former site of the stone-encrusted Village Mobil gas station at the corner of Brogden and the eastbound Katy Fwy. feeder road (pictured here as it appeared before it was torn down last year) between Campbell and Voss is currently being transformed into a brand-new Starbucks drive-thru, a source tells Swamplot. And you can reach it from the next exit, for Bingle and Voss — if, in your uncaffeinated state, you can move 3 lanes over on the feeder fast enough. (If not, just apologize to the drivers you almost cut off and try to duck into the Sweet Tomatoes parking lot across the way to work your way back; if you miss that, you can take a mile-long turnaround through the neighborhood by making a right turn on Old Voss Rd.)

CONTINUE READING THIS STORY

Katy Fwy. Coffee Chase
04/20/15 3:15pm

Framing of Galleria Jewel Box, 5085 Westheimer Rd., Houston

Framing of the new “Jewel Box” on-garage drive-up pad site Galleria add-on has begun. A reader sends in this view from above, showing how the building has been perched onto the next-to-top level of the Blue Garage, which underlies the mall’s parking-lot approach from Westheimer. Westheimer runs from left to right at the top of the photo.

Photo: Swamplot inbox

Drive Up Luxury
04/20/15 2:45pm

FORMER WESTHEIMER PLANT HOUSE GOING STEAK Future Home of Bistecca Steak House, 224 Westheimer Rd., Avondale, Montrose, HoustonThe building at 224 Westheimer Rd. in Montrose, on the north side of the street between Helena and Mason St., was long ago home to Bistro 224. Then it became the Plant House. A photo sent in by a reader late last week shows the same structure undergoing another metamorphosis as it transforms into its newest incarnation, a return to its food-serving days. According to building permits taken out for the property, the revamped building will become the Bistecca Steak House once construction is complete. Photo: Sylvia Drew