The 2 new buildings that the River Oaks Baptist School plans to start constructing side by side next month don’t have much in common with each other besides their location. The brick one — shown left to right at the video’s 9-second mark — mimics the look of the existing campus structures north of Westheimer and west of Willowick, one of which it abuts. Dubbed the school’s “Leadership Center,” it’s planned to house administrative staff along with some other adults. The taller, southern building on the other hand takes things in an entirely new direction with its multi-level, saw-tooth-edged terraces. Each one of its 4 floors will belong to a specific grade: fifth, sixth, seventh, or eighth. Right now, they all share space with pre-K through fourth grade students in the existing campus north.
By adding on 160,000-sq.-ft., ROBS will more or less double its existing footprint — reports the HBJ‘s Fauzeya Rahman — and push out to front Westheimer directly (where a new “guard entrance” will go), displacing the former Walgreens building that sits behind Pinkberry and Zoë’s Kitchen’s shared restaurant structure in the process. It’ll also make room for the school to start adding “10 students per grade level,” to what’s now an 853-kid count, Rahman writes, over an unspecified period of time. Follow along to the spot about 35 seconds in, when the camera glides into the first floor of the modern building offering a view of where its youngest tenants will congregate.



“So the 

A reader tells Swamplot one of those TABC posters is up on the building at 3107 Leeland St., and the applicant it names: The Wine House, LLC. The last tenant Metamorphose Studios did double-duty in the 2,800-sq.-ft. space: dealing furniture and also guiding visitors in the art of refurbishing items themselves (“I recommend the chairapy class,” wrote the venue’s 


Back in April, the Chronicle’s Greg Morago 

The owner of 214 Avondale St. has plans to build a 4-story apartment complex on-site and is now seeking an off-street parking variance for the would-be development. If the planning commission signs off on it next month, the building would be permitted to go up with 60 spaces, 5 less than city rules mandate for the just-under-half-acre site, 2 blocks west of Bagby and directly north of Bistecca Ristorante. (Seven bike racks capable of holding 28 bikes total would also be included.) The public hearing for the proposal goes down on Thursday, September 13. Map: Houston Planning Commission
Four floors of apartments are staking their claim to the unbuilt 2-and-a-half acre tract next to the 


