8 Story Apartments, with Retail?

Where Another Pearl Is Headed, on Washington Ave

Site of Future Pearl Washington Ave Apartments, 5424 Washington Ave at T.C. Jester, Houston

Here’s the scene at the northeast corner of Washington Ave and T.C. Jester this weekend (the view is from Schuler St., to the north), where lots are being cleared for a new apartment complex. It’ll be called the Pearl Washington Ave, after the other Pearl-brand apartments the Morgan Group has developed around town, but not necessarily after Washington Ave’s Pearl Bar. Permits filed with the city don’t yet indicate the size of the project, but the newly assembled parcel at 5424 Washington Ave measures 3.1 acres and extends all the way to Detering St. And commenters on HAIF are noting that it’s expected to be 8 stories tall — and may include some sort of retail space. Buildings currently on the site, including Gary Fruge Automotive, are being removed.

Photo: Swamplot inbox

04/28/14 12:45pm

Rendering of the Proposed Collection on Kirby, 3200 Kirby Dr., Upper Kirby, Houston

The website of New York real estate firm Thor Equities has switched out the renderings for the full-block Kirby Collection mixed-use development it’s been threatening to build on the west side of Kirby Dr. between Colquitt and W. Main St. for almost 6 years now. And the new Collection drawing collection does look pretty whizzy. It appears to show 2 levels of retail facing Kirby, a dozen-or-so-story office tower along Colquitt, and a taller squashed-cylinder-shaped residential tower on top of a parking-garage base hanging back toward Lake St.:

CONTINUE READING THIS STORY

04/09/14 10:00am

Proposed Hotel Alessandra, Dallas and Fannin Streets, GreenStreet, Downtown Houston

The lobby for the new 25-story luxury Downtown hotel announced yesterday — an add-on for the GreenStreet conversion of the former Houston Pavilions — will be on its top floor. A pool and bar will sit above it on the roof level. Its highlighted contours tracing a giant question mark, the sleek modern 225-room tower will be planted on top of the remains of former Houston Rockets center Yao Ming‘s flopped restaurant. It’ll sit back from Main St., behind XXI Forever, hugging Fannin on the block also bounded by Polk and Dallas. But the Hotel Alessandra isn’t meant to spike the retail flow in the failed-mixed-use redo project — instead, it’ll include 7,000 sq. ft. of retail and restaurant space on its bottom floors, and connect to the project’s Main St. shops and Fannin skybridge.

Here’s a view from Main St., looking southeast along Dallas:

CONTINUE READING THIS STORY

03/26/14 3:30pm

Proposed Memorial Green Mixed Use Development, 12505 and 12601 Memorial Dr., Houston

Site of Proposed Memorial Green Mixed Use Development, 12505 and 12601 Memorial Dr., HoustonA 13-and-a-half-acre park-like lot on Memorial Dr. just north of the Ethan’s Glen condo complex and across the street from the Lantern Lane Shopping Center where Fresh Market took over a former Rice Epicurean market is the planned site of a new mixed-use development. A joint venture between the property’s longtime owner, Methodist Hospital, and the developer of nearby CityCentre is behind Memorial Green, which is meant to include apartments, offices, and restaurant and retail space, as well as single-family homes. “The project will center around an urban green space, which connects the uses in a pedestrian environment,” reads a description of the project in the annual report of Midway Companies.

“Local dog owners will be devastated,” notes a Swamplot reader. The lot has long been used as an informal dog park. Surveyors have been seen at work on the property, which is sprinkled with tall pines.

A couple of blocky renderings (above and below) of early concepts for Memorial Green, planned for Methodist’s lots and 12505 and 12601 Memorial Dr., were also included in Midway’s annual report.

CONTINUE READING THIS STORY

03/25/14 12:15pm

5709-val-verde-01

5709-val-verde-04

Garage-style doors open on 2 levels (top) in a contemporary buy-or-lease live-work property located south of Westheimer near Chimney Rock. With its 11 parking spaces out front and double garage bay, the 2005 brick-and-Galvalume structure in Raponderosa Reserve kinda looks like a modern firehouse, though there’s no pole inside. It was dual-listed in January: $2.2 million to own, $10K per month to lease.

CONTINUE READING THIS STORY

03/21/14 10:45am

Sign, 2019 Washington Ave., Old Sixth Ward, Houston

Tyler Flood, 2019 Washington Ave., Old Sixth Ward, HoustonThe DWI defense specialist whose enormous “Do Not Blow” billboard presided over Washington Ave early this decade (in the words of the Houston Press) “as the enormous and bespectacled eyes of Dr. T.J. Eckleburg looked out on The Great Gatsby‘s Valley of Ashes,” has just purchased the long-vacant 11,604-sq.-ft. wedge-shaped former car lot at 2019 Washington Ave in the Old Sixth Ward. Attorney Tyler Flood (shown standing his ground on the lot, at left) plans to build a 6,700-sq.-ft. 3-story building on the corner of Washington and Henderson — with a café space on the first floor, lease space on the third floor, and his own law firm on the second. He’s hired Element Architects to design the building, which should look something like this:

CONTINUE READING THIS STORY

03/03/14 11:15am

Proposed Elan Memorial Park Apartments, 904 Westcott St., Rice Military, Houston

Architect Meeks + Partners has posted a rendering of the steel-framed apartment complex Greystar is planning to replace the Memorial Club Apartments lining the southern boundary of the Washington on Westcott roundabout. Swamplot reported Greystar’s plans for the apartments last year — along with a tip that the planned redevelopment would include a new Trader Joe’s. The rendering shows no sign of a Trader Joe’s, but it does show the base of the apartment structure filled with retail spaces and outdoor dining areas facing the roundabout. The view appears to be taken southeast from the roundabout; the existing stone Rice Military placard is in the foreground.

CONTINUE READING THIS STORY

02/07/14 11:00am

Proposed Air Liquide Center, 9811 and 9807 Katy Fwy., Memorial City, Houston

Former Memorial Location of Bally Total Fitness, 9801 Katy Fwy., HoustonThat new office tower slated for the site of the 12-year-old Bally’s, then Blast! Fitness building  (pictured at left) at the northeast corner of the Memorial City Mall will be the new American corporate headquarters of industrial gas manufacturer Air Liquide. And it’ll be 2 buildings, actually: A 452,000-sq.-ft. 20-story tower designed by Morris Architects in back, and a 145,000-sq.-ft.12-story office building designed by Gensler in front, facing the I-10 feeder road. It’ll be called Air Liquide Center, but as shown in the rendering above, the core of the 2-building sandwich will be an 8-level parking garage.

CONTINUE READING THIS STORY

01/30/14 4:30pm

Aerial View of Former Westcreek Apartments, Westcreek Ln., Highland Village, Houston

It’s mixed use, Houston style! Which means one use over here, and another over there. The Houston Business Journal‘s Jenny Aldridge has a full accounting of plans to divvy up the low-slung (at least in retrospect) Westcreek Apartments once they’re all emptied of renters. As Swamplot reported earlier, work has already begun on a 25-story SkyHouse River Oaks tower and adjacent parking garage on the northern portion of what used to be 2041 Westcreek Ln., one lot south of San Felipe and just west of the Target parking lot.

CONTINUE READING THIS STORY

01/28/14 4:45pm

COMMENT OF THE DAY: WHAT KATYVILLE COULD HAVE BEEN Adjacent Uses“From Yale St. and I-10 all the way through the First Ward to I-45, there are so many large commercial tracts that are on the market or coming on the market that you could build a whole new city. The Mahatma Rice plant is huge. The tract from Detering to Grocer’s Supply is huge. There are tons of other lots ready for redevelopment all along the Washington Corridor east of Yale St. We all know that traffic will get much worse as thousands more residents come into the area to live, shop, work and play. But the idea that traffic is just going to happen no matter what is silly. Smart development and infrastructure improvements can make a huge difference. When retail, residential and office are placed in the same development, you always reduce car trips. I used to work just outside the loop in a typical spec office building with no retail nearby. Worst traffic in the garage was at noon as everyone was scurrying out of the building to go get lunch. I now work downtown in a building that is in Houston Center. Hardly any traffic going out of the building, despite being many times bigger, during lunch as there are ample places to eat in the food court. The problem with redevelopment along Washington Ave is that everyone is just doing their own thing without any regard for trying to make the area conducive to work/shop/live/play without being reliant on cars. And the City still suffers from low self esteem and is happy to give out tax gifts without requiring any sort of return benefit. The result is that there is no connection between the retail development (largely single story title wall strip malls), residential (mostly disconnected pencil boxes) and office (an odd tower at Waugh and not much other new development). Had a single developer had control over all the available property, we could see a transformative development like a giant City Centre meets West Ave meets Post Oak Midtown. Instead, we get an odd mish mash of retail, office, and residential with little infrastructure improvements to mitigate the impacts (not even a right turn lane on Yale St. SB at I-10, which would make a huge difference). So much could be done, but so little will get done to maximize the benefits of incoming density and minimize the burdens.” [Old School, commenting on Comment of the Day: Admiral Linen and the Way of Katyville] Illustration: Lulu

01/07/14 5:00pm

2300-chenenvert-01

2300-chenenvert-03

Recent redevelopment of neighboring lots into townhomes has brought higher (and higher-density) neighbors (top) to this circa-1950 retail-ish space converted at some point into a low-rise loft (above). Currently an artist’s live-in studio, the fortress-fenced mixed-use property appeared on the market earlier this month with a $1.295 million asking price. It’s located on the east side of Midtown, southwest a block or so from the 59-288-45 spaghetti bowl.

CONTINUE READING THIS STORY

12/30/13 4:15pm

Grocers Supply, 3000 Hicks St., Houston

Grocers Supply, 3000 Hicks St., Houston

The group that completed the purchase of a 15-acre agglomeration of tracts at the southwest corner of I-10 and Studemont this week says it’s planning a mixed-use development for the site, including an apartment complex. Most of the land was owned by Grocers Supply, which has operated a 232,352-sq.-ft. produce warehouse and big-rig parking lot there for 42 years. The facility at 3000 Hicks St. is yet another chunk in the First Sixth Ward-area once-industrial swath south of the Heights that’s been turning to big-box-flavored retail bit by bit over the last decade, and now stretches from Target on the east near Sawyer to Walmart just west of Yale St. Here’s an aerial view of that district from 1990, when it was still entirely industrial (you can see the western edges of Downtown in the background):

CONTINUE READING THIS STORY

12/20/13 12:00pm

View from Corner Conference Room, Proposed ExxonMobil Office Building, Hughes Landing, The Woodlands, Texas

A couple of renderings are out of the 2 office buildings in Hughes Landing ExxonMobil has signed up to lease as part of the oil company’s surprise second new Houston-area campus. And the one above shows a broad-ranging view of the Hughes Landing development — as the office buildings’ architects at Kirksey see it. Judging from the renderings and the Hughes Landing site plan posted on the Woodlands website (below), the 2 buildings will not sit directly on the Lake Woodlands waterfront but along Hughes Landing Blvd., 2 parking garages south of the previously announced Two Hughes Landing. The view out of the corner conference room shows off the overall development’s mixed-use cred: To the left is the 175-room hotel shown on the plan, fronting Hughes Landing Blvd. and a fountained inlet of Lake Woodlands; beyond and to the right of that is the 8-story, 390-unit apartment building that sits behind a row of inlet-side restaurants with dummy names. At the far right of the image is an 8-level parking garage with a waterside grill on the ground floor (somehow obscuring the expected view of the Two Hughes Landing office building). That’s quite a view, but it’s a well-chosen one.

CONTINUE READING THIS STORY

12/17/13 10:45am

Construction at Galleria Plaza, Sage Rd. at West Alabama St., Galleria, Houston

A fence is up and some demo work appears to be beginning at Galleria Plaza, across Sage Rd. from Galleria III. The mixed-use site, which stretches between Westheimer and West Alabama, is indeed the planned location of the new Hyatt Regency hotel that Swamplot reported on last month. The 14-story hotel, which was designed by Gensler and is being developed by Songy Highroads and the Carlyle Group, will fit into the surface parking lot at the northwest corner of Sage and West Alabama shown here:

CONTINUE READING THIS STORY

12/13/13 1:15pm

Demolition Work at Richmond Ave and Cummins St., Greenway Plaza, Houston

This was the scene yesterday on the southeast corner of Richmond Ave and Cummins St. near Greenway Plaza, where the Redstone Companies and Hansen Partners are planning to build a new 11-story office building and 5-level parking garage with — if a Planning Dept. staff report describing the project is correct — an attached 5-story retail center. The development received planning commission approval last week for a reduced setback along the 2 streets that meets with planned but not-yet-approved standards for transit corridors; if Metro’s stalled University Line ever gets built, it’ll make its get-off-of-Richmond turn at this same corner. Accordingly, in documents submitted to the city, the developers appear to be holding out the undescribed retail portion for some later date: [Only] “the office building and related parking garage to be built on this site are nearing the time that a building permit will be required,” the variance application reads.

CONTINUE READING THIS STORY

12/11/13 10:30am