10/12/16 1:15pm

COUSINS AND PARKWAY MERGER BETTING ALL AND NOTHING ON HOUSTON’S OFFICE SPACE MARKET 3555 Timmons Ln., Greenway Plaza, Houston, 77027 Last week’s merger between real estate investment trusts Cousins Properties and Parkway Properties still resulted in 2 companies, notes Ralph Bivins this morning: the freshly combined firms, keeping the Cousins name, have now moved all of their Houston office holdings (along with nothing else) into a separate trust. The sequestered Houston investments are inheriting the Parkway name (that’s New Parkway, to head off any confusion), as opposed to the originally announced HoustonCo. New Parkway’s properties add up to about 8.7 million sq. ft., including Greenway Plaza (which Cousins bought back in 2013) and 4 other properties in Upper Kirby, Uptown, Tanglewood, and Westchase. Here’s a chance to buy in, Bivins writes, “whether you believe the Houston office market has reached the bottom or not” — noting also that there’s “about 3 million sq. ft. of new buildings still under construction.” [Realty News Report; previously on Swamplot] Photo of 3555 Timmons Ln.: Unilev

10/05/16 5:00pm

Corporate Plaza site, Kirby at Norfolk, Upper Kirby, Houston, 77098

The chain link that has surrounded the former site of Corporate Plazas I, II and III since the wind-down of their protracted demise now appears to be getting augmented by some wooden fencing, a reader notes. The non-paved sections of the 4-ish-acre property bundle have picked up a layer of green since the final demo odds and ends finished up in May, giving that stack of pipes in the foreground something soft to lie down on.

Survey of the surrounding office space scene: That’s the crane at work on the office tower member of the Kirby Collection visible on the far left, over the parking-garage shoulder of the River Oaks Tower at 3730 Kirby (which, like the former Corporate Plaza land across Norfolk St., is owned by California-based Triyar). The 3701 Kirby office midrise is visible on the right from across Kirby Dr.; the kinda-matching 3801 Kirby is just out of the frame above, but visible in the shot below of the new fencing from the other side:

CONTINUE READING THIS STORY

No Trespassing on Norfolk
10/04/16 11:30am

Demo of Former City of Houston Code Enforcement Building, 3300 Main St., Midtown, Houston, 77002

A gang of smaller machinery is seen spreading out across the roof of 3300 Main St. in the shot above (capturing a reader’s view of the scene from the HCC midrise next door), as a larger excavator works over some of the rubble piling up at the site lately. Also visible behind the former city code enforcement building, to the south: the now-in-full-swing MATCH theater building, and the rising facades of some of the apartment midrises going up on the Mid Main block.

CONTINUE READING THIS STORY

Midtown Falling Flat, Rising High
09/20/16 3:15pm

SHELL’S DOWNTOWN OPERATIONS TO SHED OFFICES, SCURRY OVER TO LARGER WEST HOUSTON CAMPUSES One Shell Plaza Office Tower, 910 Louisiana St., Downtown HoustonMore than half a decade after the local fretting about it started, Shell has announced that it will leave One Shell Plaza, writes Cara Smith this morning. Moreover, the company will drop nearly all of its other Downtown holdings as well, including the previously announced removal of recently-ish acquired BG Group from BG Group Place. Smith writes that the only announced exception to the pullout is Shell’s trading group at 1000 Main; the rest of the company’s downtown workers will move by early 2017 into either the Technology Center at Hwy. 6 south of Richmond Ave. or into the company’s Woodcreek campus along I-10 (south of the Addicks reservoir). [HBJ; previously on Swamplot] Photo of One Shell Plaza: Antonio Foster-Azcunaga

08/26/16 3:30pm

ESPERSON, PENNZOIL, 712 MAIN TUNNELS TO REOPEN NEXT THURSDAY AROUND STALLED SPROUT OF CAPITOL TOWER Capitol Tower Tunnel ReopeningFrom the depths of the Esperson building, a reader sends a fresh shot of a sign announcing that tunnel connections from the building to nearby 712 Main and Pennzoil Place will be open again late next week. The phrasing implies that the connections beneath the site of Skanska’s planned-for-maybe-later Capitol Tower may not all be open by that time, but the Chase Tower (which itself connects to the lawsuit-embroiled former Houston Chronicle spot) will at least be accessible via a 712 Main detour. The tunnels beneath the former home of the previously-blown-away Houston Club building have been closed since 2014 as Skanska poured a tower foundation and built a parking garage; the company said earlier this year that it won’t be moving forward with the rest of the Capitol Tower until the market looks perkier. [Previously on Swamplot] Photo: ThaChadwick

08/02/16 3:45pm

Westlake Four, 200 Westlake Park Blvd., HoustonPlease don’t turn around and stare, but suddenly another entire office tower in the Energy Corridor has become available for lease — all 20 floors of it. Any takers?

So far, only one of the 2 extremely available towers appears to qualify as a genuine see-through building — that would be the 22-story completed-but-never-occupied Energy Center Four, at N. Eldridge Pkwy. and I-10, which back in June ConocoPhillips announced it was giving up on moving into but hoped some other company (or 32) would sublease from them. And now from Nancy Sarnoff comes the other dropping shoe: energy company BP, announcing that by early next year it plans to vacate Four Westlake Park, aka WestLake Four, a little more than a mile west along the freeway feeder road, at 200 Westlake Park Blvd. BP has 7 years to go on its lease for that 22-year-old property from New York-based Falcon Real Estate Investment Management.

Photo of Westlake Park Four: Steven Baker

Getting Lonely on the Katy Fwy.
07/21/16 5:00pm

downtown-tour-1

A set of skeletal construction updates are the product of Bob Russell’s downtown photo hunt earlier this week. The view above is a Hines 2-fer: Behind James Surl’s spiky Point of View sculpture is the 32-floor apartment building on its way up at the corner of Travis and Preston (now going by Aris Market Square), with a sliver of all-business 609 Main visible on the right. The office tower has been getting its last few bits of steel stuck into place this week — check out a more centered portrait of the rooftop action (plus more covert snaps of bare beams from around the area) below:

CONTINUE READING THIS STORY

All On The Way
07/15/16 1:30pm

LONGABERGER EMPTIES 7-STORY PICNIC BASKET FOR SALE OR FORECLOSURE Meanwhile, in Newark: Yesterday Ohio-based basket weaver Longaberger finished moving the last of its employees out of its former corporate headquarters, a replica of the company’s Medium Market model (albeit 160 times larger than life). The company, which saw a 90 percent drop in sales between 2000 and 2014, is currently trying to sell off the building, which consists of a 7-story office structure behind a stucco-over-steel faux-woven facade, complete with 2 enormous handles that heat up to prevent icing in the winter.  The company has accumulated more than half a million dollars in unpaid taxes on the property; if a buyer cannot be found, the city may foreclose and offer the structure up for public auction. [Columbus Dispatch via Houston Chronicle]

05/23/16 12:00pm

Corporate Plaza I Demolition, Kirby at Norfolk, Upper Kirby, Houston, 77098

Here’s this morning’s view of the former Corporate Plaza site, now sans the skeletal midrise that spent much of May wasting away. Standing at the edge of the rubble is the Texas Direct Auto billboard, visible here from its non-dayglo-yellow backside above the cluster of excavators picking over the last of the former midrise. On the left (at the corner of Kirby and 59) is the separately-owned Shell service station property, boxed in by the increasingly empty lot throughout the entire demo spectacle.

CONTINUE READING THIS STORY

And Then There Was Shell
05/19/16 4:45pm

Corporate Plaza I Demolition, Kirby at Norfolk, Upper Kirby, Houston, 77098

Corporate Plaza I Demolition, Kirby at Norfolk, Upper Kirby, Houston, 77098Here’s the raw scene captured around lunch time today, when a small pack of excavators was sighted rooting through the debris at the base of the former Corporate Plaza I midrise. The increasingly see-through office building was fully de-striped some time between yesterday (second photo) and noon today (top); below is a quick video of the excavator crew gently yanking down a piece of what appears to be the 4th-story floor: 

CONTINUE READING THIS STORY

Break Another Little Piece
05/06/16 12:30pm

allen-center-remodel-2

One Allen Center, 1200 Smith St., Downtown, Houston, 77002Brookfield released a few renderings this morning of the plans to make over One, Two, and Three Allen Centers at the corner of Smith and Dallas streets downtown. The rendering above depicts the new plan for the greenspace between One and Two: to subtract 1 of the 2 second-story skybridges currently running parallel to Smith and add an events venue. The redo plans also include a major street-level change for One Allen Center, depicted above with a 2-story glass lobby running around corner in place of the current largely-bricked-over podium facade.

That tiny neon sign on the left edge of the turn-of-the-decade photo above once marked the location of Don Patron; the quarter-centenarian Tex-Mex lunch spot started to close in February and finished the job in March. The remodel plans swap it out for a higher-end restaurant, which will get some patio space along Smith St:

CONTINUE READING THIS STORY

1, 2, 3 Remodel
05/04/16 10:30am

Plan for Ivy District, Pearland, TX, 77583

Ralph Bivins tells Swamplot that lots of dirt is being shoved around on the foreclosed former site of the WaterLights District project, west of 288 and just south of the Beltway where all those heads of former heads of state used to hang out. Pearland’s Ivy District is now being planted on the site instead: plans for the $300-million development include a multifamily complex, condos, a senior living community, townhomes, office buildings, and room for retail.

Part of the project’s funding will come from the EB-5 visa program, which allows wealthy foreigners and their immediate families to immigrate to the US in exchange for a necessary investment expected to create at least 10 jobs. Sueba USA and Beijing-owned American Modern Green are developing the site; American Modern’s parent company Modern Land of China has worked on projects in China (including Steve Holl’s twisty Linked Hybrid in Beijing) and Vancouver, but the Ivy District is its first US venture.

American Modern Green bought the land straddling the Harris-Brazoria county line back in late 2012 following the 2010 foreclosure. Here’s the breakdown of what will go where, per the current plans on the Ivy District’s website:

CONTINUE READING THIS STORY

Planting in Pearland
04/28/16 4:15pm

Proposed Prairie Tunnel Map, per Theater Square lawsuit filings

What led up to the neighborly lawsuit filed last week over the former Houston Chronicle building’s planned demolition? A pair of letters filed with the county clerk’s office as part of the suit sheds a little light on the back-and-forth between the building’s new owners and their new neighbors. Plaintiff Theater Square, a partnership controlled by construction and development firm Linbeck, is developing the downtown block marked SITE in the map above, immediately across Prairie St. from the former Chronicle property (bought last year by Hines entity Block 58 Investors). Theater Square wants to link its own could-be-a-Class-A-contender block into the Downtown tunnel network (traced above in solid black).

The company sued both Hines and Chronicle owner Hearst News last week to stop the demo, claiming that Hearst gave it property rights to build a new tunnel through the newspaper building’s basement (via the route shown in stripes above along Travis St.) and that the demo (as currently intended) interferes with that plan. Theater Square sent a letter to Hines on April 15th citing news stories about the impending demo and requesting both access to inspect the basement and assurances that the demolition would be carried out in a way that doesn’t harm certain existing structures that the new tunnel’s already-semi-permitted building plans depend on.

CONTINUE READING THIS STORY

Fight For The Right To Tunnel
04/27/16 4:45pm

Corporate Plaza I Demolition, 2600 Kirby Dr., Upper Kirby, Houston, 77098

That’s 2 stories down and 8 left to go for the last holdout in the former Corporate Plaza office park, seen here from the northeast looking across Kirby Dr. toward 59. The freeway-facing and side facades of the once-10-story midrise have been totally removed, and the remaining facade is beginning to look a bit patchy around the top; piles of debris can be seen stretching out to the north of the structure, across the now-barren Upper Kirby plain where the partially demolished Corporate Plaza parking garage nearly demolished part of the demo team back in February.

Photo: Lulu

Office-Appropriate Cut on Kirby