Mark your calendars! The implosion of the big brick box that used to shelter Macy’s and Foley’s has been scheduled bright and early: It’ll go down at 6:10 a.m. Sunday, September 22. The Kenneth Franzheim-designed department store at 1110 Main St. has already suffered some selective chunkage, and it looks like serial crusher Cherry Demolition will be in charge of setting off the final charges.
Though Cherry is pretty experienced with this sort of thing, the building’s proximity to the light rail line seems to have spurred Metro into some serious contingency planning: Internal documents show that Metro has set up alternative service for anywhere from 2 days to 3 weeks in case something goes wrong.
Here’s the plan: The trains will stop running on the evening of Friday, September 20, to give Metro plenty of time to remove poles, wires, brackets, supports, etc. A contractor has been hired to “Utilize Containers,” says those documents, and build a wall around the water spouts and decorations at the Main Street Square station catty-corner from the building. Meanwhile, Metro will be double-checking its insurance policy.
CONTINUE READING THIS STORY