04/11/13 12:30pm

Next month, reports Real Estate Bisnow’s Catie Dixon, construction’s supposed to start on 3 more segments of the Grand Parkway: That’s why F1, F2, and G on the map here are colored in that cautionary yellow. And where G ends? Not coincidentally, adds Dixon, at that future intersection with U.S. 59, planned to be completed by 2015, the 1400-acre master-planned Valley Ranch is getting ready to sprawl out.

CONTINUE READING THIS STORY

04/11/13 10:10am

What’s going on here? From behind a window across W. Dallas, a reader sends this photo and wants to know. According to a construction manager on site, the work to this point has involved utility excavation for what will be, he says, “Class A apartments.”

CONTINUE READING THIS STORY

04/09/13 10:00am

First things first: A sign off Hwy. 6 welcoming you to Imperial Sugar Land is so far the only part of the 716-acre master-planned community that’s under construction, touts a press release from the end of March. Up next? Starting this summer, adds the press release, something like the spout-centered roundabout shown here and a 254-unit apartment complex will begin going up around the minor-league Skeeters’ Constellation Field in the so-called Ball Park District. Plans show that that district will be flanked by a mix of uses:

CONTINUE READING THIS STORY

04/04/13 10:30am

Construction’s expected to begin next week on this Whole Foods at that once-forested spot near Louetta and Cutten Rd. east of the Tomball Pkwy. The 40,443-sq.-ft. store in the master-planned community The Vintage, south of the path of the Grand Parkway, will be the first Whole Foods in North Houston. Houston Business Journal‘s Shaina Zucker notes that the Gensler-designed store will anchor the 18-acre Vintage Marketplace.

Image: Judy Nichols & Associates, via Houston Business Journal

04/02/13 11:30am

THE MUSE COMING TO CASTLE COURT Dallas developer Behringer Harvard announced today that construction’s underway on The Muse, an apartment complex planned for the 2.9 acres in Castle Court sold last summer where the former Andover Richmond Apartments had stood — until their demolition in November — for 50 years. The Muse, developed by a partnership between Behringer Harvard and Trammell Crow, will have 4 stories with 270 units atop 2 levels of parking, says the press release. Also planned for the site at 1301 Richmond near Graustark? “Common-area amenities will include a cyber cafe, business center, state-of-the-art fitness center, luxury swimming pool and dog-amenity station.” [PR Newswire; previously on Swamplot] Photo: Allyn West

04/01/13 11:50am

Spring’s a time of renewal: And the Yoakum St. apartments — and palm trees, too — pictured here came down this winter so something very like this office building could begin going up. Campanile South, it’s called, is being described by developers Hansen Partners as a 6-story, 82,000-sq.-ft. “boutique” space with retail and restaurants facing Richmond Ave. Setting up on a lot between Yoakum and Graustark, Campanile South will be be the 7th member of the Campanile family that’s clustered around St. Thomas University the University of St. Thomas and Montrose Blvd.; it’s expected to be ready for tenants in 2014.

CONTINUE READING THIS STORY

03/19/13 3:00pm

Hines has confirmed that it will be putting up something new — maybe this glow stick of an office building, maybe not — at 609 Main, just north of the former MainPlace, now BG Group Pipe Wrench. Pickard Chilton, says Hines, will design a 41-story, 815,000-sq.-ft. office tower just as soon as an anchor tenant is signed. This view of the rendering released this week seems to look south toward the Hines-owned downtown block bound by Main, Texas, Fannin, and Capitol. Now, half that block is an $8 a day parking lot. If you look closely at the rendering, you’ll see an Apple logo just to the left of that entrance teepee. Whether that will actually be a new Apple store is not confirmed — and anyway, before anything new can come in, Hines will have to tear down what’s already there: The unoccupied Texas Tower, the former Sterling Building, at 608 Fannin:

CONTINUE READING THIS STORY

03/18/13 10:15am

Where’s all the new office space in Houston? Here, reports Metrostudy’s David Jarvis. The lemming-like red dots cramming together on the Beltway and Katy Fwy. out toward the Grand Parkway denote locations that are already under construction, totaling 12.5 million square feet of new office space. The green dots denote planned locations that would add 6 million more. The ExxonMobil campus up near the Woodlands, reports Jarvis, accounts for almost half of the new construction.

Map: Metro Study Report

03/13/13 11:15am

Just outside the Loop on Telephone Rd., Frank’s Grill — or Rank’s Rill, as Hurricane Ike rendered the standalone greasy spoon’s sign — will be closing and moving south about a tenth of a mile into the larger suite shown here in the recently completed strip center on Telephone and Fairway. The strip center replaced a car dealership and a body shop. There’s no date set for Frank’s move, but an employee tells Swamplot that it should be happening in about two months.

Photos: Allyn West

03/11/13 3:00pm

This crumbly parking lot at 1625 Main St. will be where a 24-story, 336-unit residential tower called SkyHouse will begin going up in April. Concrete’s already been poured to improve the sidewalks and make planters for token landscaping to shade the street. A rep from the architecture firm Smallwood, Reynolds, Stewart, and Stewart tells Swamplot that renderings and site plans for the luxury highrise aren’t available; the photo here shows a similar development, SkyHouse Midtown in Atlanta, from the Atlanta-based firm.

CONTINUE READING THIS STORY

03/08/13 3:00pm

This is what’s going up on some prime spurfront property at the University of Houston. Next to a Chinese restaurant and that prideful parking garage on Spur 5 that inspired the Houston Chronicle’s Lisa Gray and some student rappers back in 2010, the 2-story building at the end of Calhoun Rd. on campus is being billed as Cougar Den Plaza.

CONTINUE READING THIS STORY

03/07/13 11:45am

THE SPORTS BAR THAT’S REPLACING THE SAXOPHONE ON RICHMOND Will we soon see a 70-foot red pitchfork here? Now that the Orange Show has moved that big blue horn out of the way, the former Billy Blues club at 6025 Richmond near Fountain View is getting a new sign and a renovation, a Swamplot reader notes, for the sports bar Diablo Loco Wings y Mas. Last week, Bob Wade’s 70-foot “Smokesax,” made out of Beetle parts, was trucked across town to the Orange Show’s Munger St. warehouse. [Previously on Swamplot] Photo: Swamplot inbox

03/01/13 2:30pm

Former star of The Bachelor and Austin bar mogul Brad Womack is ready to open Dogwood Houston: The renovations — including a second-story patio to give the drinkers a view of the skyline — to the former Post Edge Mailing Services building at 2403 Bagby are nearing completion, according to the bar’s Facebook page; Dogwood will be the first foray into Houston by the man who once dumped Emily Maynard over the phone; he’s part of Austin’s Carmack Concepts, which runs Sixth St. bars Chuggin’ Monkey, Dizzy Rooster, Molotov, and, of course, Dogwood.

CONTINUE READING THIS STORY

02/28/13 3:30pm

A SETBACK SETBACK FOR HEIGHTS MICROBREWERY Justin Engle and Steven Macalello want to build a microbrewery at this 9,714-sq.-ft. lot that they own on Cavalcade near the intersection of Main, Studewood, and 20th St. in the Heights; Swamplot reported in November that Engle and Macalello were constructing a tap room, brewery, and beer garden from a trucked-in kit of Houston-fabricated steel parts; they told investors then that they would be open by now. So where’s the beer? The brewers write on their blog that the city rejected their plans on account of the 25-foot setback requirement from a major road like Cavalcade: “Essentially,” the brewers write, “Planning and Development staff would rather have us create a sea of concrete and asphalt in front of our building, than let us preserve green garden space inside urban Houston.” But an update yesterday suggests that the taps just might flow, after all: “In a last minute meeting with City Planning and Development staff and director, we went through all of the plans and their pros and cons,” they write. “As a result, our architects have a lot to do.” But the brewers do say they think they’ll soon have something the city will be ready to approve. [Town in City Brewing Co.; previously on Swamplot] Photo: Town in City Brewing Co.

02/26/13 3:15pm

And here’s what BHP Billiton Petroleum’s new 30-story tower might look like. The company announced yesterday that construction will begin at 1500 Post Oak in November on the fifth skyscraper at Four Oaks Place; the proposed 560,000-sq.-ft. building, going up where a vacant 24-Hour Fitness now sits, will be connected by a skybridge to the company’s existing 1360 Post Oak building. BHP says that the twinnish towers are meant to consolidate the company’s entire workforce in Uptown.

Rendering: Houston Business Journal