07/01/09 8:48am

And suddenly, Houston Pavilions gets some action:

NRG Texas and Reliant, NRG’s retail electric company, have agreed to lease 240,000 square feet of the 11-story Pavilions Tower, which comprises most of the building at 1201 Fannin.

NRG/Reliant will take 10 floors. The law firm Sheehy, Serpe & Ware has the top floor.

The bottom three floors of Pavilions Tower have always been designated as “swing space,” which could have been used for retail or office space, Houston Pavilions co-developer Geoff Jones said. NRG/Reliant will take all of the swing space, as well as some additional space on the second floor that initially had been designated for retail, Jones said.

How much of that lonely and vacant retail “additional space” on the second floor is being turned into office space?

CONTINUE READING THIS STORY

02/26/09 10:57am

The solar-powered portable building fashioned from recycled shipping containers that’s been waiting patiently at the corner of Hyde Park and Waugh since last September isn’t just the sales office for the Mirabeau B. condo. It’s also a prototype.

Designers Joe Meppelink and Andrew Vrana of Metalab have teamed up with ttweak Renewables (creators of the Mirabeau B.’s sales graphics) and Harvest Moon (the condo’s developer) to market the structures, which they call SPACE. That stands for Solar Powered Attractive Container for Everyone — though more likely it’ll be for companies that want a sales center that also works as a big green sign.

CONTINUE READING THIS STORY

02/06/09 1:42pm

Attorney and possible mayoral candidate Ben Hall may have cost himself a few votes from the style police for his very public flirtation with purchasing State Rep. Hubert Vo’s languishing Rivercrest Megamansion last month. (Hall’s wife apparently vetoed it because it was “too big.”) But Hall’s working on a comeback, scoring glowing words from Fox26 reporter Isiah Carey after a visit yesterday to Hall’s law office — in a 1922 mansion at 530 Lovett Blvd. in Montrose:

It is by far one of the coolest legal offices I’ve seen in quite some time. It’s an old mansion that seems to be the centerpiece for the entire street. It is huge. Inside of the building is also super cool. You can tell the legal eagle took pride in decorating his offices. If worst comes to worst Hall could say this is his home and still run for Mayor of Houston.

Photo of 530 Lovett Blvd.: Isiah Carey

01/26/09 11:44am

Is Gables Residential’s West Ave development doing so well already that plans are already in place to build the mixed-use development’s second phase? Or are the cause and credit markets so hopeless that architects of a once-hoped-for follow-on project decided they might as well post images of their design, since that’s the most exposure their work will likely ever get?

Ziegler Cooper Architects, designers of the 2727 Kirby highrise going up across the street, now have posted this image of a building on the company’s website. It’s identified it as West Ave Phase II.

And there’s this description:

CONTINUE READING THIS STORY

01/19/09 1:04pm

Hot off the Swamplot tipline: Discovery Tower, going up across McKinney St. from Discovery Green Downtown, has its first tenant — and it’ll be taking the whole building.

Beginning in late 2011 — about the time Hess’s current lease at One Allen Center expires — the 30-story tower with the wind turbines on top will be renamed Hess Tower.

After the jump, details from an email announcing the move — sent out to Hess Corporation employees late this morning:

CONTINUE READING THIS STORY

01/13/09 1:01pm

That see-through office tower above the new Houston Pavilions development Downtown won’t be empty much longer. Globe St.‘s Amy Wolff Sorter reports that law firm Sheehy, Serpe & Ware has leased the top floor and a half.

Only 7 1/2 floors left!

Photo of Pavilions Tower: Houston Pavilions

12/29/08 10:50am

Problems getting credit have stalled or dashed hopes for many Houston developments, leaving vacant sites, ratty construction fences, and more than a few misleading “coming soon” signs touting unachievable goals. Off Westheimer just west of Mid Lane, though, we’ll have a much bigger and longer-lasting reminder of changed fortunes to look at, for a good long while: The steel frame of the first building in Trademark Property’s High Street project.

Work has stopped.

What happened?

CONTINUE READING THIS STORY

11/18/08 10:47am

No, this isn’t the Neighborhood Guessing Game. But there’s got to be a story behind this place.

The 2,714-square-foot “workshop” building on the corner of 9th and Harvard in the Heights, which apparently dates from 1920, has been for sale since March. It’s listed, along with a 911-sq.-ft. bungalow next door along 9th St., for $430,000 — marked down from $472,000 with 2 stops along the way.

Wanna peek inside?

CONTINUE READING THIS STORY

10/17/08 9:20am

House of Blues at Houston Pavilions, Downtown Houston

Walkways at Houston Pavilions, Downtown Houston

At the new House of Blues last night: Jay-Z. And three blocks away, Books-A-Million and a roman-numeral flagship version of Forever 21 are now open! But between them in Downtown’s brand-new mixed-use street-hovering mall? Not much going on . . . yet:

The developers of the three block long Houston Pavilions said the pavilions will be the place to go, but for now it’s mainly a lot of space.

“It’s different because you don’t have a lot of nightlife down here. But with the restaurant, the Foundations Room, and the music hall at the House of Blues, we are going to bring people to the Pavilions,” [said] Deb Eybers, President of the House of Blues.

They won’t just bring people. Tenants will also be coming to the area. But for now there are just a handful of businesses.

More are slated to come on line in December and even more in the spring. Then the complex will be at 60 percent capacity.

The complex extends from Main St. to Caroline between Dallas and Polk — only a few surface-parking-lot blocks from the Toyota Center and Discovery Green.

CONTINUE READING THIS STORY

09/03/08 2:12pm

Drawing of Allegro Builders Building at 1003 Studewood, Houston Heights

This too-cute-for-Disneyland drawing depicts Allegro Builders’ new Wild Wild West-y development at the northwest corner of Studewood and 10th in the Heights. It’s going up just north of Allegro’s headquarters building, which is home also to the Glass Wall restaurant, and is known for its vaguely-historicist facade of valet-parked SUVs.

A few vans may front the new building at 1001 and 1003 Studewood, but it’ll only be in 2 spots of handicapped parking: The main lot is in back. That’ll likely be a relief for local filmmakers, who are no doubt eager to film Universal Studios-authentic spaghetti-western-style gunfights off those front balconies.

All of which makes this new retail-with-office-above confection an ideal location for Robert Gadsby’s new restaurant, Bedford, named after the chef’s birthplace in . . . uh, England.

After the jump: The interior is gonna be . . . modern!

CONTINUE READING THIS STORY

08/29/08 8:39am

Proposed Novati Group Office Tower at 1600 West Loop South, Uptown, HoustonThe Houston Business Journal‘s Jennifer Dawson is reporting that the Novati Group’s plan to dust off a 15-year-old Ziegler Cooper design for a 20-story office tower and build it on the West Loop

appears to be in limbo. The deal isn’t dead, but it’s not moving forward.

The problems: finding debt financing . . . and that pre-leasing thing.

Meanwhile, Dawson expects Transwestern to announce details soon on a large new addition to Uptown’s Four Oaks Place — to replace the 24-Hour Fitness on Post Oak Blvd. owned by TIAA-CREF:

The proposed building being called Tower Five at Four Oaks Place is now set to be 30 stories tall, with 525,000 square feet of office space on 22 floors atop a parking garage with roughly 1,500 spaces, says Carleton Riser, head of Transwestern’s development group.

He says the building designed by architectural firm Pickard Chilton could break ground in the first quarter of 2009.

The fact that no tenants have committed to the new building won’t delay construction, Riser says.

Rendering: Ziegler Cooper

07/17/08 6:56pm

Rendering of Lakeview Business Park, 14502 Fondren Rd., Missouri City, Texas

The Willowisp Country Club is being transformed — from not-loved-enough golf course . . . to tilt-wall paradise! First, the clubhouse was clubbed. Then somebody probably had to go around and remove all those holes. Now the first three buildings of Trammell Crow’s new 168-acre Lakeview Business Park are under construction, reports Amy Wolff Sorter in Globe St. They’ll be complete next year, and total 240,000 sq. ft.

Whether the remainder of the park goes spec, build to suit or a combination of both depends on the market. “We’re offering the buildings for sale or for lease, which is a little different from our typical program,” says James Casey, TCC’s managing director in Houston. TCC’s more traditional MO is to keep and lease what it builds.

“This method offers us greater flexibility since we have a lot of land for the business park,” Casey tells GlobeSt.com. “We’d like to get this park developed as quickly as we can and think offering these for sale will accelerate velocity of bringing users to the park.”

After the jump: a site plan, plus public-transit-friendly views of the first three buildings!

CONTINUE READING THIS STORY

06/23/08 8:39am

Discovery Tower, Downtown Houston

New drawings and details appear of Discovery Tower, the 30-story office building now under construction at the northwest corner of Discovery Green Downtown.

The wind turbines at the top of the building are still there. The brochure also mentions solar panels on the south face of the building, a green roof on top of the entrance pavilion, 2 stories of retail, as well as some old Houston favorites: 2 floors of underground parking (151 cars), and a 10-story, 1,350-space parking garage one block north, connected by . . . . an air-conditioned (phew!) skybridge!

After the jump, more green-hot Downtown tower architectural rendering porn!

CONTINUE READING THIS STORY

05/01/08 10:56am

Proposed Office Tower at 1600 West Loop South, Uptown, Houston

From Ziegler Cooper Architects’ website: Renderings of a 20-story office tower the firm designed back in the early 1990s.

As we reported in February, the Novati Group plans to build the 500,000-square-foot spec tower, along with an 8-level parking garage, at 1600 West Loop South — next to Post Oak Motor Cars, on land purchased from Landry’s. The only changes from the original design will be adjustments so the building can qualify for LEED Silver certification.

So what if the design is old? Worrying that your brand new building already looks dated is so . . . last decade!

After the jump: the marble in the lobby will be old, too!

CONTINUE READING THIS STORY